If you write pipeline specifications in Canada and you have not looked at the bend clauses since 2022, this one matters.
The split
Until August 2022, induction bends and cold bends both sat inside CSA Z245.11, the standard covering steel fittings. They were then removed from Z245.11 and given standards of their own:
- CSA Z245.16 covers induction bends
- CSA Z245.17 covers cold bends
Z245.11 still exists and still covers steel fittings. It just no longer covers bends.
What changed in the requirements
The split was not purely administrative. The revised standards brought changes in three areas that show up directly on a job:
- Mechanical test requirements were revised.
- Hardness requirements for sour service were revised. If you are working in H₂S service, this is the clause to read.
- Charpy test specimen sizes were revised.
Why this costs money
Destructive testing consumes material and time. A test bend is a bend you produced and then cut up rather than shipped. When the testing requirements increase, that cost has to sit somewhere, and on smaller orders it can be a meaningful proportion of the price.
This is worth understanding when you compare quotes. A bender quoting to the current testing requirements and a bender quoting to the old ones will not produce comparable numbers.
Testing next door
Our dedicated destructive testing lab is co-located next door to the plant, so testing does not mean shipping specimens to a third party and waiting.
What to put on your enquiry
Reference the current standard for the process you need: Z245.16 for induction, Z245.17 for cold. State the grade and, if it is sour service, the category. Those three pieces of information determine the testing regime, and therefore the price and the schedule.